+90 533 300 32 01
C3 ChipZentronix
TPS65980EVM

Texas Instruments

TPS65980EVM

SMPS Evaluation Boards

RoHS: Compliant

Request a quote for pricing

Priced by quantity and lead time.

Shipping

Same-day dispatch from stock

Genuine parts

Verified sourcing

RoHS

Compliant

Support

Technical team support

Specifications

Outputs And Type
3, Non-Isolated
Nem Hassasiyeti (MSL)
1 (Unlimited)
Board Type
Fully Populated
RoHS Durumu
Non-RoHS Compliant
Utilized Ic Part
TPS65980
Fabrika Tedarik Süresi
4 Weeks
Lifecycle Status
ACTIVE (Last Updated: 1 week ago)
Main Purpose
DC/DC, Step Up or Down
Parça Durumu
Active
Supplied Contents
Board(s)
Maks. Çalışma Sıcaklığı
85°C
Min. Çalışma Sıcaklığı
-40°C
Çıkış Gerilimi
3.3V 3.3V 3.3V
Evaluation Kit
Yes
Pin Sayısı
0
Kılıf / Paket
Module
Output Current
3.5A
Regulator Topology
Buck-Boost

Related Products

  • Digi

    101-0131

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    105030005

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    106990003

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    106990005

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    106990007

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    106990019

    SMPS Evaluation Boards
  • Seeed Technology Co., Ltd

    114990167

    SMPS Evaluation Boards
  • Würth Elektronik

    17800FDSM

    SMPS Evaluation Boards
  • Fast Delivery

    Same-day prep and shipping from stock

    Genuine Parts

    Sourced from authorized channels

    Datasheet

    Technical documents for each part

    Technical Support

    Help before and after the sale